1.Briefing
  It could used to obtain fresh air after filter poison in the underground projects. When the electricity supply is ok, the fan could driven by electricity; when electricity supply is cut , the fan could be driven manually. It is the necessary air exchange equipment for air defence projects or underground buildings.
2.Technology parameter of F270-2
3.Installation , using and maintenance of F270-2
  1. Make sure the motor insulation and the balance of three phase power reach the requirement before installation. Make sure every part of the fan is fastened and rotate flexible. Then add oil about 35mm and make the bottom of double chain gear could touch the oil surface.
  2. The rotation handle center is 0.8 to 1.056m above the ground. Customers could connect the filter pipeline and air clean pipeline with the air inlet according fan system diagram and professional design diagram; air outlet could connect with air-meter, FX-1 flow volume display or inside pipeline, but the filter, air-meter (flow volume display) and other pipeline, valve could not put onto the fan.
  3. The motor and handle rotary direction must be the same along the sign that is the clockwise rotation of impeller viewing from the front of motor. These products are mainly used for war preparation. After the machine was shakedown run well, if it is not used that time, take down the handle and put it away near the fan.
  4. three-phase motor could directly drive the fan; if single-phase motor is used, please close the air duct first, open the air duct until the rotation speed reaches the rating. Add lube on the main shaft by the back rotation handle to make the shaft lubricant.
  5. Rotate the handle proportionally. If the rotation speed is not the rating one, the air capacity should be transformed according the follow formula.
 In the formula, n1, Q1, H1 refer to the rotation speed, flow volume and air pressure in rating condition.
 N2,Q2,H2 refer to the speed, flow volume and air pressure in real situation.
  6. Do not make the motor run long and continuously when pipeline has not been installed.
  7. check the isolation resistance in wet weather. Dry the isolation resistance when it lower than two tramegger.
  8. Use professional ??? when dismount impeller.
4.Model dimension and installation size
Note:
  1.All the bracket connection points should be welded.
  2.Make the up plank and bottom be parallel when weld bracket.
  3.If there is no special requirement, paint  rustproof paint two times, then smear metal ?two times.
 
Note: the fan bracket aspect diagram is only for reference. Users could make it by themselves.

Dezhou Air Conditioner Equipment Co., Ltd.
Address: No.181,North Dongdi Road, Tianqu Industry Park ,Dezhou
TEL:0534—2356870 2358328
FAX:0534—2358326
huifeng888@263.net
w-hf@263.net
Office in Beijing Address Room 302,The unit 14,Jiayuanerli fengtai beijing
Ceil phone:13522964184 13520981127
Contact:Li Xian Tao Lui Wei Jun
Office in Zaoqiang
Address: Fiberglass Garden ,Zaoqiang Town,Hebei Province
TEL:0318—7056261
FAX:0318—7056261
Ceil phone:13583474833
Contact:Bei De Yu
Office in Shijiazhuang
Address: Room 301,the Third Unit, No. 31 Building, Yangang New District
FAX:0311-5877888
TEL:0311-6700382
Ceil phone:139-31983216
Contact: Yuan Jin'an
Office in Shenyang
Address: No.26 Nonliuzhonglu Rood.Tiexi Shenyang
Ceil phone13589940048
Contact : An Shuwei